8 floors of an 11 storey office block fit out with a new shower block and cycle bay in the basement car park. New VRF systems installed per floor with condensers located on the roof on a new raised deck. Centralised controls for each floor which links to the BMS system. New supply and extract ductwork installed to incorporate the new design for the open planned CAT A works. New toilet block which includes a cleaners cupboard, DDA, male and female toilets. New BMS system to link to existing system. Degas several old comms room A/C systems to allow for the new CAT A design.

3 / 4 Albermale Street & 45 -46 Albermale Street
A portfolio of buildings offered as a package following provision of service for two buildings and now increased to six. M&E services along with water